Sonatrech Exploration & WINC+ Success
Objective: To provide the operator with fast, economic, reliable and definitive real time surveys — saving valuable rig time and eliminating gyroscopic/wireline survey costs.
Performance: The WINC+ system performed above and beyond with 0 hours of NPT throughout the course of 14 days (not including Coring Operations) drilling in one hole section. Three WINC+ runs separated by two coring runs.